What to do when you need to make fast decision

I need to start the remaining filling at the retaining wall area. But the question is there are unsuitable fillng material which was dump by others on the slope, to remove them require a big sum. So, who should bear the cost? is it a wrong decision earlier to stockpile material there?
I think what we hope the unsuit earth can be used later without disturb the foundation of rc wall during compaction is mere dreaming.
My decision is to remove the unsuit and backfill with good material. We have to bear the cost of mistake made earlier.